Pre-Treatment Program

Pre-Treatment Program

Boiler Water Program

Boiler Water Program

Cooling Water Program

Cooling Water Program

Wastewater Program

Wastewater Program

Remove it rather than treat it!

Eldon Water engineers can design an appropriate pre-treatment solution to minimize your total operating costs and your reliance on chemical treatment products.

Softener, dealkalizer, deionizers, reverse osmosis systems, media filtration units – let our engineers determine which proven solution has the best return for you. Our customized equipment is sized and fabricated in-house to suit your specific application.
Ensuring reliable operation is critical to the success of the overall water treatment program. We are trained and equipped to provide immediate troubleshooting and repair to minimize downtime.
We measure and track performance to ensure peak efficiency and lower the cost of operation. We optimize regenerant use, and extend resin and membrane life through brine elution studies, membrane fouling analysis and CIP (Clean in Place).
Our extensive in-house stock of pre-treatment equipment and repair parts ensures same-day availability, with delivery and installation within 48 hours.

Remove it rather than treat it!

Eldon Water engineers can design an appropriate pre-treatment solution to minimize your total operating costs and your reliance on chemical treatment products.

Softener, dealkalizer, deionizers, reverse osmosis systems, media filtration units – let our engineers determine which proven solution has the best return for you. Our customized equipment is sized and fabricated in-house to suit your specific application.

Ensuring reliable operation is critical to the success of the overall water treatment program. We are trained and equipped to provide immediate troubleshooting and repair to minimize downtime.

We measure and track performance to ensure peak efficiency and lower the cost of operation. We optimize regenerant use, and extend resin and membrane life through brine elution studies, membrane fouling analysis and CIP (Clean in Place).

Our extensive in-house stock of pre-treatment equipment and repair parts ensures same-day availability, with delivery and installation within 48 hours.

Head Office

Access Request

Legionnaires’ Disease Guide for Employers and Building Owners Download

Aqua Analytics DK-12000 Download

Checklist for Minimizing Legionella Risk Download

Purchaser Checklist for Setting Base Case Scenario Download

Engineering Notes – Deaerator Download

Tower & Chiller Lay-Up Procedure Download

Blog Newsletter Subscription

Contact Me

Service Locations

Ohio Sales Office

Michigan Sales Office

American Head Office

Close